Welcome to Lower Bari Doab Canal Improvement Project (LBDCIP)

Lower Bari Doab Canal Improvement Project

2. Project Components

2.1 Rehabilitation and Upgrading (R&U) of Balloki Barrage Complex

  • Rehabilitation and upgrading of Barrage structure.
  • Removal of pitched island upstream of the barrage.
  • Construction of divide wall upstream of barrage structures.
  • Improvement in the barrage flood flow capacity by construction of a new gated spillway and road bridge along the right bank of the River.
  • Construction of additional B-S Link Canal head regulator.

  • Refurbish existing B-S Link Canal head regulator.

  • Rehabilitation and upgrading of the LBDC head regulator.

  • Rehabilitation of all gates and lifting gear mechananism including, as necessary ,provision of seals, replacement of roller trains and repair of roller tracks.

  • Motorization of gates with facilities for electrical and manual operation and
    local control.

  • Provision of electrical and conventional piezometers to monitor uplift pressure beneath the structures.

  • Improvements to upstream river training works.

Project Detail
News Jobs in PMO Canals
For details Gazetted Jobs
Non-Gazetted Jobs
INVITATION FOR BIDS | CONTRACT No. WKS/JIP/ICB-P2
The deadline for submission of bids is further extended from 16-04-2019 to 07-05-2019. For details Click Here